Triple

T333249
Position Surface form Disambiguated ID Type / Status
Subject Whaling Museum (Nantucket) E6669 entity
Predicate instanceOf P0 FINISHED
Object whaling museum C84 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: whaling museum
Context triple: [Whaling Museum (Nantucket), instanceOf, whaling museum]
  • A. art museum
    An art museum is a public or private institution that collects, preserves, studies, and exhibits works of art for education, inspiration, and cultural enrichment.
  • B. cultural institution chosen
    A cultural institution is an organized establishment, such as a museum, library, theater, or gallery, dedicated to preserving, interpreting, and promoting the arts, heritage, and shared cultural expressions of a community or society.
  • C. public sculpture
    A public sculpture is a three-dimensional artwork installed in outdoor or communal spaces, intended for public viewing and interaction, often reflecting cultural, historical, or social themes.
  • D. seaport
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • E. harbor
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e79434908190a9d5afe415153ad9 completed Feb. 28, 2026, 1:03 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.