Triple
T33303235
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Surveyor General of Arkansas Territory |
E852641
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public land survey position |
C61705
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public land survey position Context triple: [Surveyor General of Arkansas Territory, instanceOf, public land survey position]
-
A.
geodetic survey
A geodetic survey is a precise method of measuring and mapping large areas of the Earth's surface that accounts for its curvature and gravitational variations to establish accurate positions, elevations, and reference frameworks.
-
B.
surveying base
A surveying base is a fixed reference point or station established on the ground from which precise measurements and observations are made to determine positions, distances, and elevations in land surveying.
-
C.
land and population survey
A land and population survey is a systematic assessment that collects, maps, and analyzes data on land use, ownership, and physical characteristics alongside demographic information about the people living in a defined area.
-
D.
land surveying examination
A land surveying examination is a formal assessment that tests a candidate’s knowledge, skills, and competency in surveying principles, practices, laws, and standards required for professional licensure or certification.
-
E.
surveyor
A surveyor is a professional who measures and maps land, boundaries, and features to provide precise data for construction, engineering, and legal purposes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34966ed4c81908dc9dda82d8c7fe3 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:33 a.m.