Triple
T33214840
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Huizinge earthquake |
E850261
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | induced earthquake |
C61535
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: induced earthquake Context triple: [Huizinge earthquake, instanceOf, induced earthquake]
-
A.
induced earthquake zone
An induced earthquake zone is a geographic area where seismic activity is primarily triggered or significantly influenced by human activities such as fluid injection, extraction, or reservoir impoundment.
-
B.
interplate earthquake
An interplate earthquake is a seismic event that occurs along the boundary between two tectonic plates as they grind, collide, or slide past one another.
-
C.
intraplate earthquake
An intraplate earthquake is a seismic event that occurs within the interior of a tectonic plate, far from plate boundaries, typically caused by the reactivation of ancient faults or stresses transmitted through the plate.
-
D.
earthquake sequence
An earthquake sequence is a series of temporally and spatially related earthquakes, including mainshocks, foreshocks, and aftershocks, that occur as a fault system adjusts to stress changes in the Earth's crust.
-
E.
earthquake catalog
An earthquake catalog is a systematically compiled database that records the occurrence, location, magnitude, and other key parameters of earthquakes over a specified region and time period.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3495fb92c819083ce65d0ddee7a76 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:30 a.m.