Triple
T33150290
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cheruthoni Dam |
E848415
|
entity |
| Predicate | projectInstalledCapacity |
P11312
|
FINISHED |
| Object | 780 MW (Idukki Hydroelectric Project) |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 780 MW (Idukki Hydroelectric Project) | Statement: [Cheruthoni Dam, projectInstalledCapacity, 780 MW (Idukki Hydroelectric Project)]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: projectInstalledCapacity Context triple: [Cheruthoni Dam, projectInstalledCapacity, 780 MW (Idukki Hydroelectric Project)]
-
A.
installedCapacity
chosen
Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
-
B.
plannedCapacityMW
Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
-
C.
installedCapacityUnit
Indicates the unit of measurement used to express the installed capacity associated with an entity.
-
D.
hasPlannedCapacity
Indicates that an entity is associated with a specified capacity level that is planned or intended for future use rather than currently realized.
-
E.
solarPlantCapacity
Indicates the maximum electrical power output that a solar power plant is designed or able to produce.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3495a458c8190a1d34b237ba0be3f |
completed | April 30, 2026, 12:21 p.m. |
| NER | Named-entity recognition | batch_69f6db6af1d88190989810182354d60f |
completed | May 3, 2026, 5:21 a.m. |
| PD | Predicate disambiguation | batch_69f6d82d068c8190940a3200ed760e38 |
completed | May 3, 2026, 5:07 a.m. |
Created at: May 1, 2026, 1:28 a.m.