Triple

T33150290
Position Surface form Disambiguated ID Type / Status
Subject Cheruthoni Dam E848415 entity
Predicate projectInstalledCapacity P11312 FINISHED
Object 780 MW (Idukki Hydroelectric Project) NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 780 MW (Idukki Hydroelectric Project) | Statement: [Cheruthoni Dam, projectInstalledCapacity, 780 MW (Idukki Hydroelectric Project)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: projectInstalledCapacity
Context triple: [Cheruthoni Dam, projectInstalledCapacity, 780 MW (Idukki Hydroelectric Project)]
  • A. installedCapacity chosen
    Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
  • B. plannedCapacityMW
    Indicates the intended or scheduled power generation capacity of an energy asset, measured in megawatts (MW).
  • C. installedCapacityUnit
    Indicates the unit of measurement used to express the installed capacity associated with an entity.
  • D. hasPlannedCapacity
    Indicates that an entity is associated with a specified capacity level that is planned or intended for future use rather than currently realized.
  • E. solarPlantCapacity
    Indicates the maximum electrical power output that a solar power plant is designed or able to produce.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3495a458c8190a1d34b237ba0be3f completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6db6af1d88190989810182354d60f completed May 3, 2026, 5:21 a.m.
PD Predicate disambiguation batch_69f6d82d068c8190940a3200ed760e38 completed May 3, 2026, 5:07 a.m.
Created at: May 1, 2026, 1:28 a.m.