Triple
T3313323
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tigris–Euphrates river system |
E69623
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river network |
C3077
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river network Context triple: [Tigris–Euphrates river system, instanceOf, river network]
-
A.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
B.
river basin
chosen
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
-
C.
river
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
D.
river corridor
A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
-
E.
drainage basin
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85a0bb048190a5458d2738012d61 |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:11 p.m.