Triple

T33099633
Position Surface form Disambiguated ID Type / Status
Subject British electricity transmission network E847005 entity
Predicate synchronizationArea P143582 FINISHED
Object synchronous area of Great Britain
The synchronous area of Great Britain is the large interconnected power system covering England, Scotland, and Wales that operates at a unified frequency to ensure stable and reliable electricity supply.
E2036364 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: synchronous area of Great Britain | Statement: [British electricity transmission network, synchronizationArea, synchronous area of Great Britain]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: synchronous area of Great Britain
Triple: [British electricity transmission network, synchronizationArea, synchronous area of Great Britain]
Generated description
The synchronous area of Great Britain is the large interconnected power system covering England, Scotland, and Wales that operates at a unified frequency to ensure stable and reliable electricity supply.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3495590dc8190aa04f3dec74ce976 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6d6ac00488190876b0db0fb5fb29b completed May 3, 2026, 5:01 a.m.
NED1 Entity disambiguation (via context triple) batch_6a34f02d166c819087db339d79e19d83 completed June 19, 2026, 7:30 a.m.
NEDg Description generation batch_6a34f0e90d74819098d317d3b13a2dff completed June 19, 2026, 7:34 a.m.
NED2 Entity disambiguation (via description) batch_6a34f44bf06481909e8011dd816e6601 completed June 19, 2026, 7:48 a.m.
Created at: May 1, 2026, 1:26 a.m.