Triple

T33080841
Position Surface form Disambiguated ID Type / Status
Subject Westinghouse XCA248 E846502 entity
Predicate instanceOf P0 FINISHED
Object railway signaling system component C3574 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway signaling system component
Context triple: [Westinghouse XCA248, instanceOf, railway signaling system component]
  • A. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • C. railway infrastructure element chosen
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • D. railway coupling system
    A railway coupling system is a mechanical assembly that connects railway vehicles together, transmitting forces for traction and braking while maintaining alignment and safe separation between cars.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34954d46c8190a04a159cc5f99efd completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:26 a.m.