Triple

T33065694
Position Surface form Disambiguated ID Type / Status
Subject Barrikady factory E846093 entity
Predicate instanceOf P0 FINISHED
Object heavy machinery plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: heavy machinery plant
Context triple: [Barrikady factory, instanceOf, heavy machinery plant]
  • A. heavy equipment manufacturer
    A heavy equipment manufacturer is a company that designs, engineers, and produces large-scale machinery and vehicles used in construction, mining, agriculture, and other industrial applications.
  • B. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • C. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • D. excavator
    An excavator is a heavy construction machine equipped with a boom, stick, bucket, and cab on a rotating platform, used primarily for digging, lifting, and moving earth or other materials.
  • E. specialized tractor
    A specialized tractor is a purpose-built agricultural vehicle designed with specific attachments, power configurations, and structural features to efficiently perform particular farming tasks such as orchard work, vineyard cultivation, or hillside operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3495333b8819095e9af56855b9061 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:25 a.m.