Triple

T33007191
Position Surface form Disambiguated ID Type / Status
Subject RIIO-GD1 E844533 entity
Predicate instanceOf P0 FINISHED
Object RIIO price control period C58549 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: RIIO price control period
Context triple: [RIIO-GD1, instanceOf, RIIO price control period]
  • A. electricity reliability regulator
    An electricity reliability regulator is an authority responsible for setting, monitoring, and enforcing standards to ensure the continuous, safe, and dependable operation of the electric power system.
  • B. Electricity regulatory commission
    An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
  • C. RBS 56 BILL
    RBS 56 BILL is a Swedish-manufactured, man-portable, wire-guided anti-tank missile system designed to defeat armored vehicles using a top-attack warhead.
  • D. E-Rate program document
    An E-Rate program document is an official record or form used to plan, request, justify, or report discounted telecommunications and internet services for eligible schools and libraries under the federal E-Rate program.
  • E. electricity supply industry
    The electricity supply industry encompasses the generation, transmission, distribution, and retail of electrical power from producers to end users, ensuring reliable and efficient energy delivery.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494e59f08190b9127c693e5c7e8f completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:23 a.m.