Triple
T330047
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cadillac Escalade |
E6605
|
entity |
| Predicate | platform |
P1292
|
FINISHED |
| Object | GM GMT800 platform |
E7698
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GM GMT800 platform | Statement: [Cadillac Escalade, platform, GM GMT800 platform]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: GM GMT800 platform Context triple: [Cadillac Escalade, platform, GM GMT800 platform]
-
A.
GMT800
chosen
GMT800 is General Motors' full-size truck and SUV platform introduced in the late 1990s, underpinning vehicles like the Chevrolet Silverado and GMC Sierra.
-
B.
GMT400
GMT400 is General Motors’ full-size pickup and SUV platform produced from the late 1980s through the 1990s, underpinning vehicles like the Chevrolet C/K and GMC Sierra.
-
C.
GTS
GTS is an abbreviation commonly used for the Global Telecommunication System, an international network for exchanging meteorological data.
-
D.
GMT900
GMT900 is General Motors' full-size truck and SUV platform used for late-2000s models such as the Chevrolet Silverado and related vehicles.
-
E.
G.826x
G.826x is an ITU-T standards series that defines methods and requirements for packet-based frequency and time synchronization in telecommunications networks.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e79434908190a9d5afe415153ad9 |
completed | Feb. 28, 2026, 1:03 p.m. |
| NER | Named-entity recognition | batch_69a2eaaeb64881909c7ab9bca3378e2b |
completed | Feb. 28, 2026, 1:16 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a3cff160788190a49faad3c011965e |
completed | March 1, 2026, 5:34 a.m. |
Created at: Feb. 28, 2026, 1:08 p.m.