Triple
T32993345
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Damodar Valley Corporation |
E844151
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | power utility |
C359
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: power utility Context triple: [Damodar Valley Corporation, instanceOf, power utility]
-
A.
electric utility
chosen
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
public utility company
A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
-
C.
utility division
A utility division is an organizational unit within a company responsible for managing and delivering essential support services—such as power, water, communications, or shared infrastructure—to internal or external customers efficiently and reliably.
-
D.
power system
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
E.
utilities company
A utilities company is an organization that provides essential public services such as electricity, gas, water, or telecommunications to residential, commercial, and industrial customers, typically under government regulation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3494d99988190b502c68926af2c4d |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:22 a.m.