Triple

T3296715
Position Surface form Disambiguated ID Type / Status
Subject Zambezi Basin E69232 entity
Predicate hasHydropowerDam P15311 FINISHED
Object Itezhi-Tezhi Dam E70872 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itezhi-Tezhi Dam | Statement: [Zambezi Basin, hasHydropowerDam, Itezhi-Tezhi Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Itezhi-Tezhi Dam
Context triple: [Zambezi Basin, hasHydropowerDam, Itezhi-Tezhi Dam]
  • A. Itezhi-Tezhi Dam chosen
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • B. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • C. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • D. Jebba Dam
    Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
  • E. Kinzua Dam
    Kinzua Dam is a large U.S. Army Corps of Engineers flood-control and hydroelectric dam in northwestern Pennsylvania that created the Allegheny Reservoir.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859e529c8190a404273f53cb487d completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adb078f3dc8190afb624f62894e48f completed March 8, 2026, 5:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69b367e9e414819088ec4b05495b86e1 completed March 13, 2026, 1:27 a.m.
Created at: March 8, 2026, 3:10 p.m.