Triple

T32925840
Position Surface form Disambiguated ID Type / Status
Subject Thomas Fichandler E842269 entity
Predicate instanceOf P0 FINISHED
Object theatre administrator C40378 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: theatre administrator
Context triple: [Thomas Fichandler, instanceOf, theatre administrator]
  • A. theatre executive chosen
    A theatre executive is a senior manager responsible for overseeing the artistic vision, financial health, and operational management of a theatre organization or venue.
  • B. theatre producer
    A theatre producer is the individual responsible for overseeing and coordinating all financial, logistical, and organizational aspects of a stage production, from securing rights and funding to assembling the creative team and managing the show’s run.
  • C. theatre director
    A theatre director is the creative leader who interprets a script and coordinates actors, designers, and technical staff to shape the overall vision and execution of a stage production.
  • D. theatrical producer
    A theatrical producer is the individual responsible for overseeing and coordinating all financial, logistical, and creative aspects of a stage production, from development and funding through casting, rehearsals, and performance.
  • E. theatre practitioner
    A theatre practitioner is an individual who actively creates, performs, directs, designs, or otherwise contributes artistically and technically to the production and study of live theatrical performance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34948adfc8190a937f1f622783c0b completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:20 a.m.