Triple
T32887150
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Strand (beachfront walkway) |
E841231
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | paved multi-use path |
C58011
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: paved multi-use path Context triple: [Strand (beachfront walkway), instanceOf, paved multi-use path]
-
A.
pedestrian walkway
A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
-
B.
stone-paved track
A stone-paved track is a pathway or road surface constructed from closely fitted stones to provide a durable, stable route for travel or transport.
-
C.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
D.
rail trail
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
E.
long-distance footpath
A long-distance footpath is an extended, often waymarked walking route designed for multi-day journeys across varied landscapes, typically connecting towns, natural landmarks, or regions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349446e288190a70c05bcc4d81172 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:18 a.m.