Triple

T32862375
Position Surface form Disambiguated ID Type / Status
Subject Westover approach control E840550 entity
Predicate instanceOf P0 FINISHED
Object approach control facility C3808 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: approach control facility
Context triple: [Westover approach control, instanceOf, approach control facility]
  • A. air traffic control tower
    A structure at an airport from which air traffic controllers monitor and direct aircraft movements on the ground and in the airspace around the airport to ensure safe and efficient operations.
  • B. VORTAC station
    A VORTAC station is a ground-based aviation navigational facility that combines VOR (VHF Omnidirectional Range) and TACAN (Tactical Air Navigation) systems to provide both azimuth and distance information to aircraft.
  • C. air navigation organization chosen
    An air navigation organization is an entity responsible for planning, managing, and controlling the safe and efficient movement of aircraft through designated airspace using air traffic services, communication, navigation, and surveillance systems.
  • D. aviation ground operations
    Aviation ground operations encompass all activities and services performed on the ground to support aircraft turnaround, safety, and readiness between flights.
  • E. aviation infrastructure organization
    An aviation infrastructure organization is an entity responsible for planning, developing, operating, and maintaining the physical and technological systems that support air transportation, such as airports, air traffic control, and related facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34942465c819099b3fb47f9044f58 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:17 a.m.