Triple

T32837770
Position Surface form Disambiguated ID Type / Status
Subject Diósgyőri kohászat E839882 entity
Predicate instanceOf P0 FINISHED
Object metallurgical plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metallurgical plant
Context triple: [Diósgyőri kohászat, instanceOf, metallurgical plant]
  • A. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • B. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • C. metallurgical process
    A metallurgical process is a series of physical and chemical operations used to extract, refine, and shape metals from their ores or recycled materials into usable forms with desired properties.
  • D. integrated steel mill
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • E. smelting company
    A smelting company is a business that extracts and refines metals from their ores through high-temperature processing and related metallurgical operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493ff0888190b51e974eae2a7834 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:16 a.m.