Triple

T32837768
Position Surface form Disambiguated ID Type / Status
Subject Diósgyőri kohászat E839882 entity
Predicate instanceOf P0 FINISHED
Object steelworks complex C3461 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: steelworks complex
Context triple: [Diósgyőri kohászat, instanceOf, steelworks complex]
  • A. integrated steel mill chosen
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • B. stockyard complex
    A stockyard complex is a large, organized facility where livestock are received, sorted, held, and prepared for sale, transport, or slaughter, typically including pens, loading areas, and support infrastructure.
  • C. historic blast furnace complex
    A historic blast furnace complex is an industrial site, often preserved as heritage, where iron ore was once smelted at high temperatures in large furnaces along with associated structures such as casting houses, coke ovens, and worker facilities.
  • D. steel finishing facility
    A steel finishing facility is an industrial plant where semi-finished steel products undergo surface treatment, coating, cutting, and other final processing steps to meet specific quality, dimensional, and performance requirements.
  • E. industrial and residential complex
    A mixed-use development that integrates industrial facilities with residential housing, designed to support both production activities and everyday living within a coordinated, shared environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493ff0888190b51e974eae2a7834 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:16 a.m.