Triple

T3279375
Position Surface form Disambiguated ID Type / Status
Subject Illawarra railway line E68836 entity
Predicate instanceOf P0 FINISHED
Object suburban rail line C74 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: suburban rail line
Context triple: [Illawarra railway line, instanceOf, suburban rail line]
  • A. commuter rail line chosen
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • B. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • C. urban rail loop line
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • D. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859c463481909ca4be267336c290 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:10 p.m.