Triple

T3275045
Position Surface form Disambiguated ID Type / Status
Subject Temple of Olympian Zeus E68737 entity
Predicate constructionResumedIn P5779 FINISHED
Object 2nd century BC LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2nd century BC | Statement: [Temple of Olympian Zeus, constructionResumedIn, 2nd century BC]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionResumedIn
Context triple: [Temple of Olympian Zeus, constructionResumedIn, 2nd century BC]
  • A. constructionResumed chosen
    Indicates that previously halted construction activity on an entity or project has started again.
  • B. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • C. constructionContinuedUnder
    Indicates that construction activity on something persisted or proceeded during the time or under the authority, control, or conditions associated with a specified entity or period.
  • D. resumedIn
    Indicates that an activity, process, or state that was previously paused or interrupted has started again within or at a specified context, time, or location.
  • E. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad859b54f881909bf530d549caf2fd completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adaff8a440819092509bc8511b2785 completed March 8, 2026, 5:20 p.m.
PD Predicate disambiguation batch_69ada420167c81909b6e2702db296d9e completed March 8, 2026, 4:30 p.m.
Created at: March 8, 2026, 3:10 p.m.