Triple
T32730213
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MTU diesel engine |
E836928
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | powerplant |
C4822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: powerplant Context triple: [MTU diesel engine, instanceOf, powerplant]
-
A.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
B.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
C.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
D.
industrial plant
chosen
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
E.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34935fb048190ad4967420581f835 |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:11 a.m.