Triple
T32703459
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sea Skua missile (early work) |
E836205
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental anti-ship missile project |
C59336
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental anti-ship missile project Context triple: [Sea Skua missile (early work), instanceOf, experimental anti-ship missile project]
-
A.
guided missile development program
chosen
A guided missile development program is an organized, multi-phase effort to research, design, test, and field guided missile systems that meet specified performance, cost, and operational requirements.
-
B.
anti-ship missile variant
An anti-ship missile variant is a specific version of a naval strike missile adapted or modified from a base design to optimize performance, guidance, payload, or launch platform compatibility against maritime targets.
-
C.
surface-to-ship missile
A surface-to-ship missile is a guided weapon launched from land, sea, or air platforms specifically designed to detect, track, and destroy naval surface vessels.
-
D.
military project
A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
-
E.
cruise missile
A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3493323288190a4e88251035fe96e |
completed | April 30, 2026, 12:21 p.m. |
Created at: May 1, 2026, 1:10 a.m.