Triple

T32690371
Position Surface form Disambiguated ID Type / Status
Subject Osaka Kinzoku Kogyosho E835840 entity
Predicate instanceOf P0 FINISHED
Object metalworks company C10947 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metalworks company
Context triple: [Osaka Kinzoku Kogyosho, instanceOf, metalworks company]
  • A. ironworks chosen
    Ironworks is a facility or industrial plant where iron and steel are smelted, forged, cast, or otherwise processed into usable metal products and structures.
  • B. smelting company
    A smelting company is a business that extracts and refines metals from their ores through high-temperature processing and related metallurgical operations.
  • C. metalbender
    A metalbender is an individual with the supernatural ability to sense, manipulate, and reshape metal using mental or elemental control.
  • D. fabbriceria
    A fabbriceria is an Italian ecclesiastical body responsible for the administration, maintenance, and preservation of church buildings and their assets.
  • E. machinist
    A machinist is a skilled tradesperson who sets up, operates, and maintains machine tools to manufacture precision metal or plastic parts according to technical specifications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493211388190993801216afbc2a7 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:09 a.m.