Triple

T3268063
Position Surface form Disambiguated ID Type / Status
Subject Hillsborough River E68574 entity
Predicate crossedBy P416 FINISHED
Object Interstate 4 E155290 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 4 | Statement: [Hillsborough River, crossedBy, Interstate 4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 4
Context triple: [Hillsborough River, crossedBy, Interstate 4]
  • A. Interstate 4 chosen
    Interstate 4 is a major east–west highway in central Florida that connects the Tampa Bay area to Daytona Beach and the Atlantic coast, passing through Orlando along the way.
  • B. Interstate 75
    Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
  • C. Interstate 16
    Interstate 16 is an east–west U.S. Interstate Highway in Georgia that connects Macon to the coastal city of Savannah and serves as a key route to the Atlantic coast.
  • D. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • E. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8590444081909e8107a8aeef3a23 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adafcf9c6c819092f9c618b778b46d completed March 8, 2026, 5:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69b28ef261ec819091c62620765e2cef completed March 12, 2026, 10:01 a.m.
Created at: March 8, 2026, 3:09 p.m.