Triple

T3267313
Position Surface form Disambiguated ID Type / Status
Subject Samsung C&T E68557 entity
Predicate instanceOf P0 FINISHED
Object construction and trading company C12582 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction and trading company
Context triple: [Samsung C&T, instanceOf, construction and trading company]
  • A. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • B. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • C. real estate investment and development company
    A real estate investment and development company acquires, finances, plans, and builds or renovates properties to generate returns through rental income, sales, and long-term asset appreciation.
  • D. real estate investment and development company
    A real estate investment and development company acquires, finances, plans, and builds or renovates properties to generate long-term value and returns for stakeholders.
  • E. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8590444081909e8107a8aeef3a23 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:09 p.m.