Triple

T32672741
Position Surface form Disambiguated ID Type / Status
Subject Mary Fisk E835342 entity
Predicate instanceOf P0 FINISHED
Object film production coordinator C39202 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film production coordinator
Context triple: [Mary Fisk, instanceOf, film production coordinator]
  • A. film supervisor
    A film supervisor oversees and coordinates key aspects of a film’s production—such as departments, schedules, budgets, and creative continuity—to ensure the project is completed efficiently and in line with the director’s vision.
  • B. production assistant chosen
    A production assistant is an entry-level crew member who supports various logistical, administrative, and on-set tasks to help ensure a film, television, or media production runs smoothly.
  • C. assistant film director
    An assistant film director supports the main director by coordinating on-set activities, managing the shooting schedule, communicating instructions to cast and crew, and ensuring that production runs smoothly and efficiently.
  • D. film production system
    A film production system is an integrated framework of processes, tools, and roles that collaboratively plan, create, manage, and deliver motion picture content from initial concept through final distribution.
  • E. film and television production phase
    A film and television production phase is a distinct stage in the creation process—such as development, pre-production, production, post-production, or distribution—during which specific tasks and workflows are carried out to move a project from concept to final release.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3493134b48190aa3c8cb523bd3800 completed April 30, 2026, 12:21 p.m.
Created at: May 1, 2026, 1:09 a.m.