Triple

T32668262
Position Surface form Disambiguated ID Type / Status
Subject HGM-25A Titan I program E835215 entity
Predicate launchPreparationRequirement P68707 FINISHED
Object missile had to be raised from silo before launch LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: missile had to be raised from silo before launch | Statement: [HGM-25A Titan I program, launchPreparationRequirement, missile had to be raised from silo before launch]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: launchPreparationRequirement
Context triple: [HGM-25A Titan I program, launchPreparationRequirement, missile had to be raised from silo before launch]
  • A. preparationRequirement chosen
    Indicates that one entity must be prepared, configured, or made ready as a necessary condition before another entity, action, or process can occur or be valid.
  • B. planningRequirement
    Indicates that one entity imposes or specifies a planning-related obligation, condition, or prerequisite that must be satisfied by another entity or activity.
  • C. launchOnMission
    Indicates initiating the sending of an entity (typically a vehicle, spacecraft, or device) to carry out a specific mission or operation.
  • D. launchProcedure
    Indicates the process or sequence of actions required to initiate or start an operation, system, or mission.
  • E. maintenanceRequirement
    Indicates that an entity is obligated to perform, schedule, or adhere to specific maintenance activities or conditions for another entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349303ccc8190a70d0f6e8a21d3fb completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f7221dc9a88190bb8194fcc29c42bc completed May 3, 2026, 10:23 a.m.
PD Predicate disambiguation batch_69f72153a9188190b02adc84e1be4af8 completed May 3, 2026, 10:20 a.m.
Created at: May 1, 2026, 1:08 a.m.