Triple

T326519
Position Surface form Disambiguated ID Type / Status
Subject Croton water supply system E6530 entity
Predicate newAqueductCompletion P1511 FINISHED
Object 1890s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1890s | Statement: [Croton water supply system, newAqueductCompletion, 1890s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: newAqueductCompletion
Context triple: [Croton water supply system, newAqueductCompletion, 1890s]
  • A. constructionCompleted chosen
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. waterInfrastructure
    Indicates the existence, development, or management of systems and facilities that supply, store, treat, or distribute water between entities.
  • C. domeCompleted
    Indicates that the construction or formation of a dome structure has been fully finished.
  • D. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • E. waterwayServed
    Indicates that a place, facility, or infrastructure is served by, connected to, or functionally supported by a particular waterway.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7933d6c8190bb2592ad13286ef2 completed Feb. 28, 2026, 1:03 p.m.
NER Named-entity recognition batch_69a2ea974d8481908c7d84f72a7728b6 completed Feb. 28, 2026, 1:16 p.m.
PD Predicate disambiguation batch_69a2e94aab1c8190b8654708c87eeb91 completed Feb. 28, 2026, 1:10 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.