Triple

T3256549
Position Surface form Disambiguated ID Type / Status
Subject Sydney Trains E68309 entity
Predicate operatorOf P179 FINISHED
Object T8 Airport & South Line E68838 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: T8 Airport & South Line | Statement: [Sydney Trains, operatorOf, T8 Airport & South Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: T8 Airport & South Line
Context triple: [Sydney Trains, operatorOf, T8 Airport & South Line]
  • A. T8 Airport & South Line (Sydney Trains) chosen
    T8 Airport & South Line (Sydney Trains) is a suburban passenger rail service in Sydney that connects the city centre with the airport and southern suburbs as part of the Sydney Trains network.
  • B. S1 Line
    The S1 Line is a medium-capacity maglev rapid transit line in the Beijing Subway system serving the western suburbs of the city.
  • C. S2 line
    The S2 line is a route of the Rhine-Main S-Bahn network serving the Frankfurt metropolitan area, including central hubs such as Frankfurt Hauptwache station.
  • D. RTA Waterfront Line
    The RTA Waterfront Line is a light rail line in Cleveland, Ohio, that connects downtown with the city's waterfront attractions and nearby neighborhoods.
  • E. MRT Grey Line
    The MRT Grey Line is a planned rapid transit route within the MRT subway network designed to expand urban rail connectivity along its corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad858f74408190bcbd07f967cd7bd0 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69adaf68b280819087c302d454490c03 completed March 8, 2026, 5:18 p.m.
NED1 Entity disambiguation (via context triple) batch_69b28ece1d1c81909bacadecea679a7f completed March 12, 2026, 10 a.m.
Created at: March 8, 2026, 3:09 p.m.