Triple
T325411
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Edison General Electric Company |
E6505
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electrical equipment manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electrical equipment manufacturer Context triple: [Edison General Electric Company, instanceOf, electrical equipment manufacturer]
-
A.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
B.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
C.
electronic amplifying device
An electronic amplifying device is a component or system that increases the amplitude of an electrical signal without significantly altering its original characteristics.
-
D.
conductor
A conductor is an individual who directs the performance of an orchestra, choir, or other musical ensemble by guiding tempo, dynamics, and expression to unify the musicians’ interpretation of a piece.
-
E.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7933d6c8190bb2592ad13286ef2 |
completed | Feb. 28, 2026, 1:03 p.m. |
Created at: Feb. 28, 2026, 1:08 p.m.