Triple

T32497731
Position Surface form Disambiguated ID Type / Status
Subject South–North Water Transfer Project E830572 entity
Predicate notableBeneficiaryCity GENERATED
Object Beijing UNRECOGNIZED GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: notableBeneficiaryCity
Context triple: [South–North Water Transfer Project, notableBeneficiaryCity, Beijing]
  • A. beneficiaryCity chosen
    Indicates that a city is the recipient or beneficiary of some action, service, resource, or arrangement.
  • B. notableTerminusCity
    Indicates that a city is notably recognized as a terminus (endpoint) of a route, line, or network.
  • C. notableInCity
    Indicates that an entity is particularly prominent, recognized, or significant within a specific city.
  • D. notableCityIncluded
    Indicates that a notable or significant city is contained within, or is part of, a larger geographic or administrative entity.
  • E. notableCitiesRepresented
    Indicates that an entity includes or features certain cities as particularly important or prominently represented within it.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349219cb8819087e120f509629c1b completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:59 a.m.