Triple

T32467938
Position Surface form Disambiguated ID Type / Status
Subject Swift River (controlled releases) E829764 entity
Predicate instanceOf P0 FINISHED
Object regulated river flow C50487 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regulated river flow
Context triple: [Swift River (controlled releases), instanceOf, regulated river flow]
  • A. regulated river reach
    A regulated river reach is a segment of a river whose flow, water level, or timing is intentionally controlled by human-made structures such as dams, weirs, or diversion works.
  • B. re-regulating dam chosen
    A re-regulating dam is a secondary dam built downstream of a main dam to smooth out fluctuating releases, stabilizing river flow and improving conditions for water use and ecosystems.
  • C. river conservancy
    River conservancy is the management and protection of river ecosystems through planning, regulation, restoration, and sustainable use to maintain their ecological health and benefits to society.
  • D. riverine force
    A riverine force is a military or security unit specialized in conducting operations, patrols, and logistical support on rivers and inland waterways using small boats and related craft.
  • E. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3491ee87c81908cbf5890079c2af6 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:57 a.m.