Triple
T3244879
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sun Grid Engine |
E68045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | batch-queuing system |
C10342
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: batch-queuing system Context triple: [Sun Grid Engine, instanceOf, batch-queuing system]
-
A.
time-sharing system
A time-sharing system is an operating system that allows multiple users or processes to share computing resources concurrently by rapidly switching the CPU among them, giving the illusion of simultaneous execution.
-
B.
workload management feature
chosen
A workload management feature is a system capability that helps plan, distribute, and monitor tasks and resources to balance capacity, avoid bottlenecks, and ensure timely completion of work.
-
C.
multitasking operating system
A multitasking operating system is software that manages computer hardware and resources to run multiple processes or applications seemingly simultaneously by rapidly switching the CPU among them and coordinating their execution.
-
D.
waterfall system
A waterfall system is a linear, sequential project management or development approach in which progress flows through distinct, non-overlapping phases from requirements to deployment with minimal iteration.
-
E.
SCM system
An SCM system (Supply Chain Management system) is a software platform that plans, executes, and monitors the end-to-end flow of goods, information, and finances across the supply chain to optimize efficiency, cost, and service levels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad858e4c708190aa31d486cfee8a6a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:09 p.m.