Triple
T324355
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Route 25 (via Route 28 connection) |
E6480
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | highway approach route |
C3646
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: highway approach route Context triple: [Route 25 (via Route 28 connection), instanceOf, highway approach route]
-
A.
parkway
A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
-
B.
north–south highway
A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
-
C.
avenue
An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
-
D.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
E.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7933d6c8190bb2592ad13286ef2 |
completed | Feb. 28, 2026, 1:03 p.m. |
Created at: Feb. 28, 2026, 1:08 p.m.