Triple

T32429129
Position Surface form Disambiguated ID Type / Status
Subject USS Montgomery (LCS-8) E828668 entity
Predicate instanceOf P0 FINISHED
Object Independence-class littoral combat ship C60201 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Independence-class littoral combat ship
Context triple: [USS Montgomery (LCS-8), instanceOf, Independence-class littoral combat ship]
  • A. Oliver Hazard Perry-class frigate
    The Oliver Hazard Perry-class frigate is a class of guided-missile frigates designed for anti-submarine, anti-air, and limited surface warfare, primarily serving as versatile escort ships for larger naval task forces.
  • B. Clemson-class destroyer
    The Clemson-class destroyer was a large group of U.S. Navy flush-deck destroyers built just after World War I, designed for high speed and long-range escort and patrol duties.
  • C. littoral combat ship chosen
    A littoral combat ship is a fast, agile, and modular naval surface vessel designed to operate in near-shore (littoral) environments for missions such as mine countermeasures, anti-submarine warfare, and surface combat.
  • D. Knox-class frigate
    The Knox-class frigate is a class of U.S. Navy anti-submarine warfare ships built in the late 1960s and 1970s, designed for long-range escort duties with advanced sonar, helicopter facilities, and limited anti-air and surface warfare capabilities.
  • E. Arleigh Burke-class destroyer
    The Arleigh Burke-class destroyer is a class of multi-mission guided-missile destroyers of the United States Navy, designed for anti-air, anti-submarine, and anti-surface warfare using the Aegis Combat System.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3491b28bc8190b75cea7a507f337b completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:54 a.m.