Triple
T32386804
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jiuquan LC-43 |
E827563
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | crew-rated launch complex |
C5843
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: crew-rated launch complex Context triple: [Jiuquan LC-43, instanceOf, crew-rated launch complex]
-
A.
crew-rated launch vehicle
A crew-rated launch vehicle is a rocket system specifically designed, tested, and certified to safely transport humans to, in, and from space.
-
B.
space launch facility
chosen
A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
-
C.
Saturn V mobile launcher
The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
-
D.
vertical launch system
A vertical launch system is a ship- or land-based arrangement of vertical cells that store, protect, and rapidly fire missiles straight up before they pitch toward their targets.
-
E.
heavy-lift launch vehicle
A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349184e7481909c6c54428cb9cf12 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:51 a.m.