Triple
T32323795
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Bridge Technologies |
E825848
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge engineering company |
C25896
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge engineering company Context triple: [International Bridge Technologies, instanceOf, bridge engineering company]
-
A.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
B.
bridge design bureau
chosen
A bridge design bureau is a specialized engineering organization responsible for planning, analyzing, and designing bridge structures to meet safety, functionality, and aesthetic requirements.
-
C.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
D.
bridge builder
A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
-
E.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f34912d0c48190bba75770660320e9 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:47 a.m.