Triple

T32258282
Position Surface form Disambiguated ID Type / Status
Subject ROBDD E824078 entity
Predicate instanceOf P0 FINISHED
Object reduced ordered binary decision diagram C58140 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reduced ordered binary decision diagram
Context triple: [ROBDD, instanceOf, reduced ordered binary decision diagram]
  • A. reduction between decision problems
    A reduction between decision problems is a systematic transformation that converts instances of one decision problem into instances of another such that solving the latter correctly also yields a correct solution to the former.
  • B. Gröbner basis algorithm
    A Gröbner basis algorithm is a computational procedure that transforms a set of multivariate polynomials into a special generating set (a Gröbner basis) that simplifies solving and analyzing polynomial ideal problems such as solving systems of equations, ideal membership, and elimination.
  • C. binary computer
    A binary computer is a digital computing system that represents and processes all data and instructions using only two discrete states, typically denoted as 0 and 1.
  • D. directed graph
    A directed graph is a set of vertices connected by edges that have a specific direction, indicating ordered relationships from one vertex to another.
  • E. polynomial-time many-one reduction
    A polynomial-time many-one reduction is a function computable in polynomial time that transforms instances of one decision problem into instances of another such that the original instance is a "yes" instance if and only if the transformed instance is a "yes" instance.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490db0748190bfef6e50c95d39d3 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:41 a.m.