Triple

T3224859
Position Surface form Disambiguated ID Type / Status
Subject Rondout Reservoir E67599 entity
Predicate hasDam P8736 FINISHED
Object Rondout Dam E337234 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rondout Dam | Statement: [Rondout Reservoir, hasDam, Rondout Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rondout Dam
Context triple: [Rondout Reservoir, hasDam, Rondout Dam]
  • A. Rondout Dam chosen
    Rondout Dam is a major earthen dam in New York that impounds the Rondout Reservoir as part of the New York City water supply system.
  • B. Kensico Dam
    Kensico Dam is a massive early-20th-century masonry dam in Valhalla, New York, that forms the Kensico Reservoir and serves as a key component of New York City's water supply system.
  • C. Palisades Dam
    Palisades Dam is a large earthfill dam in eastern Idaho that provides irrigation water storage, hydroelectric power, and flood control on the upper Snake River.
  • D. Rondout Reservoir
    Rondout Reservoir is a major New York City water supply reservoir in the Catskill Mountains, formed by damming Rondout Creek and serving as a key component of the city’s Catskill–Delaware water system.
  • E. Old Croton Dam
    Old Croton Dam was the original 19th-century masonry dam that formed part of New York City’s first major public water supply system before being superseded by the New Croton Dam.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad858c61888190a31196310d9b30b5 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69adae1c51a48190b4a395650528b5d8 completed March 8, 2026, 5:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69b2e826c50c8190a6e472e7a8862df2 completed March 12, 2026, 4:21 p.m.
Created at: March 8, 2026, 3:08 p.m.