Triple
T3222513
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Bathymetric Chart of the Arctic Ocean |
E67541
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mapping project |
C11101
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mapping project Context triple: [International Bathymetric Chart of the Arctic Ocean, instanceOf, mapping project]
-
A.
cartographic map
A cartographic map is a scaled, symbolic representation of geographic space that depicts the spatial relationships of physical and human-made features on the Earth’s surface.
-
B.
landmark planning blueprint
A landmark planning blueprint is a strategic, visual, and documented plan that outlines the design, placement, significance, and long-term development of key landmarks within a geographic or urban context.
-
C.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
plan
chosen
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
-
E.
thematic map
A thematic map is a type of map designed to highlight a specific subject or theme—such as population density, climate, or land use—across a geographic area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad858b8adc8190ad989712c87a476b |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:08 p.m.