Triple
T3220475
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Øresund Bridge |
E67499
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | combined road and rail bridge–tunnel |
C12485
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: combined road and rail bridge–tunnel Context triple: [Øresund Bridge, instanceOf, combined road and rail bridge–tunnel]
-
A.
railroad bridge
A railroad bridge is a specialized structure that carries railway tracks over obstacles such as roads, rivers, valleys, or other rail lines, ensuring safe and continuous train passage.
-
B.
railway bridge
A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
-
C.
highway bridge
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
D.
double-decked bridge
A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
-
E.
rail tunnel
A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad858b8adc8190ad989712c87a476b |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:08 p.m.