Triple
T32201438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wilson Industrial Air Center |
E822548
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | industrial aviation facility |
C9918
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: industrial aviation facility Context triple: [Wilson Industrial Air Center, instanceOf, industrial aviation facility]
-
A.
aircraft factory
An aircraft factory is an industrial facility where aircraft and their components are designed, manufactured, assembled, and tested before delivery to customers.
-
B.
aviation infrastructure organization
An aviation infrastructure organization is an entity responsible for planning, developing, operating, and maintaining the physical and technological systems that support air transportation, such as airports, air traffic control, and related facilities.
-
C.
aircraft hangar
An aircraft hangar is a large, enclosed structure designed for housing, maintaining, and protecting aircraft from weather and environmental conditions.
-
D.
business aviation airport
chosen
A business aviation airport is a specialized airfield designed primarily to serve private, corporate, and charter aircraft with tailored facilities and services for business travelers.
-
E.
business aviation airport
A business aviation airport is a specialized airfield designed primarily to serve private, corporate, and charter aircraft with tailored facilities and services for non-scheduled, business-focused air travel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349093174819086e633c190a51aa8 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:36 a.m.