Triple
T321010
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Disney Skyliner |
E6415
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aerial gondola lift system |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aerial gondola lift system Context triple: [Disney Skyliner, instanceOf, aerial gondola lift system]
-
A.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
B.
people mover system
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
C.
elevated railway
An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
-
D.
airlift
Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
-
E.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e7933d6c8190bb2592ad13286ef2 |
completed | Feb. 28, 2026, 1:03 p.m. |
Created at: Feb. 28, 2026, 1:08 p.m.