Triple
T32071045
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Savannah street grid |
E819011
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | city layout |
C15908
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: city layout Context triple: [Savannah street grid, instanceOf, city layout]
-
A.
urban street grid
An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
-
B.
town plan
chosen
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
C.
urban planning structure
An urban planning structure is a designed physical or organizational element within a city—such as streets, parks, zoning frameworks, or transit systems—that shapes how urban space is organized, used, and experienced.
-
D.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
E.
urban skyline
An urban skyline is the distinctive outline of a city formed by the arrangement and silhouette of its buildings and structures against the sky.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348fecc088190af1470afe5a969f0 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:23 a.m.