Triple

T320486
Position Surface form Disambiguated ID Type / Status
Subject Interstate 95 near Newport, Maine E6402 entity
Predicate snowRemovalBy P12437 FINISHED
Object Maine Department of Transportation E6403 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Maine Department of Transportation | Statement: [Interstate 95 near Newport, Maine, snowRemovalBy, Maine Department of Transportation]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Maine Department of Transportation
Context triple: [Interstate 95 near Newport, Maine, snowRemovalBy, Maine Department of Transportation]
  • A. Maine Department of Transportation chosen
    The Maine Department of Transportation is the state government agency responsible for planning, building, and maintaining Maine’s transportation infrastructure, including highways, bridges, and related facilities.
  • B. Massachusetts Department of Transportation
    The Massachusetts Department of Transportation is the state agency responsible for planning, building, and maintaining Massachusetts’ transportation infrastructure, including highways, public transit, and other mobility systems.
  • C. New Hampshire Department of Transportation
    The New Hampshire Department of Transportation is the state agency responsible for planning, building, and maintaining New Hampshire’s transportation infrastructure, including highways, bridges, and related facilities.
  • D. Maryland Department of Transportation
    The Maryland Department of Transportation is the statewide agency responsible for planning, building, operating, and maintaining Maryland’s transportation systems, including highways, transit, ports, aviation, and rail services.
  • E. Oregon Department of Transportation
    The Oregon Department of Transportation is the state agency responsible for planning, building, and maintaining Oregon’s transportation systems, including highways, public transit support, rail, and other infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: snowRemovalBy
Context triple: [Interstate 95 near Newport, Maine, snowRemovalBy, Maine Department of Transportation]
  • A. snowCover
    Indicates that one entity is covered by or blanketed with snow.
  • B. snowfallRecord
    Indicates that a specific amount of snow has been measured or documented for a particular place and time.
  • C. removalMechanism
    Indicates the method or process by which something is removed, eliminated, or taken away from a system or context.
  • D. dropType
    Indicates the manner or category of how something is dropped, released, or caused to fall.
  • E. hasGlacier
    Indicates that one entity possesses, contains, or is characterized by the presence of a glacier.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7933d6c8190bb2592ad13286ef2 completed Feb. 28, 2026, 1:03 p.m.
NER Named-entity recognition batch_69a2ea8047c08190872c875e00f6e7dd completed Feb. 28, 2026, 1:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69a3cfe82d348190892f0aa8c352d04b completed March 1, 2026, 5:34 a.m.
PD Predicate disambiguation batch_69a2e946607081909c8b97473aaf8d1b completed Feb. 28, 2026, 1:10 p.m.
PDg Predicate description generation batch_69a2ea7d03a88190aab72e61d8673488 completed Feb. 28, 2026, 1:15 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.