Triple

T32048544
Position Surface form Disambiguated ID Type / Status
Subject Astoria Riverwalk E818420 entity
Predicate instanceOf P0 FINISHED
Object pedestrian and bicycle trail C30362 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian and bicycle trail
Context triple: [Astoria Riverwalk, instanceOf, pedestrian and bicycle trail]
  • A. rail trail
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • B. recreation trail
    A recreation trail is a designated path or route intended for non-motorized leisure activities such as walking, hiking, cycling, or horseback riding, often located in natural or scenic areas.
  • C. equestrian trail
    An equestrian trail is a designated path or route specifically designed and maintained for horseback riding, often featuring suitable terrain, signage, and accommodations for horses and riders.
  • D. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • E. waterfront greenway chosen
    A waterfront greenway is a linear, publicly accessible open space along a body of water that combines pedestrian and bicycle paths with landscaping, recreation areas, and ecological features to connect communities and enhance shoreline environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fcfb648190859f6be5e04b7cfe completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:20 a.m.