Triple
T32037116
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hope Creek Unit 1 |
E818124
|
entity |
| Predicate | designElectricalOutput_MWe |
P10373
|
FINISHED |
| Object | approximately 1219 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 1219 | Statement: [Hope Creek Unit 1, designElectricalOutput_MWe, approximately 1219]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: designElectricalOutput_MWe Context triple: [Hope Creek Unit 1, designElectricalOutput_MWe, approximately 1219]
-
A.
electricPowerOutput
Indicates the amount of electrical power produced or delivered by an entity.
-
B.
designPowerOutput
chosen
Indicates the intended or specified power output level that something is designed to produce under defined conditions.
-
C.
netElectricalCapacity_MWe
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
-
D.
typicalElectricalOutputRange
Indicates the usual range of electrical power or energy output that an entity is expected to produce under normal operating conditions.
-
E.
grossElectricalCapacity_MWe
Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348fbc8148190b3c0f95d4772b153 |
completed | April 30, 2026, 12:20 p.m. |
| NER | Named-entity recognition | batch_69fe30bc64308190b603ff1b30c2aeee |
completed | May 8, 2026, 6:51 p.m. |
| PD | Predicate disambiguation | batch_69fe2f7175b081908dd61e1513620bbe |
completed | May 8, 2026, 6:46 p.m. |
Created at: May 1, 2026, 12:19 a.m.