Triple

T32037116
Position Surface form Disambiguated ID Type / Status
Subject Hope Creek Unit 1 E818124 entity
Predicate designElectricalOutput_MWe P10373 FINISHED
Object approximately 1219 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 1219 | Statement: [Hope Creek Unit 1, designElectricalOutput_MWe, approximately 1219]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: designElectricalOutput_MWe
Context triple: [Hope Creek Unit 1, designElectricalOutput_MWe, approximately 1219]
  • A. electricPowerOutput
    Indicates the amount of electrical power produced or delivered by an entity.
  • B. designPowerOutput chosen
    Indicates the intended or specified power output level that something is designed to produce under defined conditions.
  • C. netElectricalCapacity_MWe
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • D. typicalElectricalOutputRange
    Indicates the usual range of electrical power or energy output that an entity is expected to produce under normal operating conditions.
  • E. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fbc8148190b3c0f95d4772b153 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69fe30bc64308190b603ff1b30c2aeee completed May 8, 2026, 6:51 p.m.
PD Predicate disambiguation batch_69fe2f7175b081908dd61e1513620bbe completed May 8, 2026, 6:46 p.m.
Created at: May 1, 2026, 12:19 a.m.