Triple

T32037082
Position Surface form Disambiguated ID Type / Status
Subject Hope Creek Unit 1 E818124 entity
Predicate instanceOf P0 FINISHED
Object commercial nuclear generating unit C27232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: commercial nuclear generating unit
Context triple: [Hope Creek Unit 1, instanceOf, commercial nuclear generating unit]
  • A. nuclear power facility chosen
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • B. nuclear power generation fleet
    A nuclear power generation fleet is a coordinated group of nuclear power plants and reactors managed collectively to produce electricity reliably, efficiently, and safely across a power system or region.
  • C. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • D. decommissioned nuclear reactor
    A decommissioned nuclear reactor is a permanently shut-down nuclear facility that has been defueled, dismantled or secured, and placed under long-term monitoring and waste management to ensure ongoing safety and environmental protection.
  • E. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348fbc8148190b3c0f95d4772b153 completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:19 a.m.