Triple

T318599
Position Surface form Disambiguated ID Type / Status
Subject Panama Canal E7762 entity
Predicate constructionChallenges P12940 FINISHED
Object tropical diseases LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: tropical diseases | Statement: [Panama Canal, constructionChallenges, tropical diseases]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionChallenges
Context triple: [Panama Canal, constructionChallenges, tropical diseases]
  • A. constructionSite
    Indicates that an entity is a location or area where construction work is actively taking place or is planned to occur.
  • B. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. constructionMethod
    Indicates the technique or process by which something is built, assembled, or created.
  • E. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2e7e7af7881908890039d6be4e9b8 completed Feb. 28, 2026, 1:04 p.m.
NER Named-entity recognition batch_69a2eb7df63c8190b7cd1bcfdfd96187 completed Feb. 28, 2026, 1:19 p.m.
PD Predicate disambiguation batch_69a2e94513ec819089f5177f7a521e65 completed Feb. 28, 2026, 1:10 p.m.
PDg Predicate description generation batch_69a2eb7c56bc8190ab787801af2eec8d completed Feb. 28, 2026, 1:19 p.m.
Created at: Feb. 28, 2026, 1:08 p.m.