Triple

T31765092
Position Surface form Disambiguated ID Type / Status
Subject Hindenburgdamm E810784 entity
Predicate instanceOf P0 FINISHED
Object railway embankment C3574 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway embankment
Context triple: [Hindenburgdamm, instanceOf, railway embankment]
  • A. road–rail embankment
    A road–rail embankment is an elevated earth or engineered structure designed to simultaneously support and separate both roadway and railway transport corridors above the surrounding ground level.
  • B. embankment section
    An embankment section is a cross-sectional representation of a raised earth or engineered structure built to support or protect infrastructure such as roads, railways, or flood defenses.
  • C. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • D. railway infrastructure element chosen
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • E. railway bridge
    A railway bridge is a structure built to carry train tracks over obstacles such as roads, rivers, valleys, or other railways, ensuring safe and continuous rail transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348e463e08190b902d4819195e1f0 completed April 30, 2026, 12:19 p.m.
Created at: April 30, 2026, 11:32 p.m.