Triple
T31764176
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mersey Docks and Harbour system |
E810761
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | harbour system |
C32558
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: harbour system Context triple: [Mersey Docks and Harbour system, instanceOf, harbour system]
-
A.
harbor system
chosen
A harbor system is an integrated arrangement of physical infrastructure, navigational facilities, operational processes, and regulatory mechanisms that collectively enable the safe, efficient berthing, handling, and movement of vessels, cargo, and passengers within a coastal or inland port area.
-
B.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
C.
harbor company
A harbor company is an organization that manages, operates, and maintains port facilities and related maritime services for the handling of ships, cargo, and passengers.
-
D.
harbormaster office
A harbormaster office is the administrative and operational center at a port or marina responsible for coordinating vessel movements, enforcing harbor regulations, and managing maritime safety and services.
-
E.
harbour expansion
Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f348e463e08190b902d4819195e1f0 |
completed | April 30, 2026, 12:19 p.m. |
Created at: April 30, 2026, 11:31 p.m.